Motorola MVME956UM2 Manual Do Utilizador

Página de 60
3-2
Computer Group Literature Center Web Site
Operating Procedures
3
Power Control Procedure
A suggested power-on procedure for the chassis is as follows: 
1. Ensure that all modules and cabling are properly configured and 
installed. Also check that all required external cabling (to 
peripherals) is correctly installed. 
2. Plug in the AC line cord (at the rear of the chassis) and connect the 
cord to an AC power source. 
3. Set the power switch at the front of the chassis to (ON). The power 
supply cycles up and the cooling fans immediately come on. 
4. Power up any peripheral equipment interfaced to the chassis that has 
its own power on/off switch. 
A suggested power-off sequence for the chassis is as follows: 
Note 
Ensure that proper software shutdown procedures have been 
executed before you continue. 
1. Power down any peripheral equipment interfaced to the chassis that 
has its own power on/off switch. 
2. Set the power switch to OFF. The power supply cycles down, and 
the cooling fans stop running. For the AC chassis only, the power 
supply fan will continue to run.