Lucent Technologies R5SI Manual Do Utilizador

Página de 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-103
ANN-BD (Announcement Circuit Pack) 
10
3. The 
save/restore announcements
 command times out with:
Error encountered, can’t complete request
 
The Announcement circuit pack lock-up can be cleared remotely by 
performing a soft reset to the circuit pack:
busyout board PCSS
 (this command drops all calls in progress on 
the Announcement circuit pack)
reset circuit pack using the 
reset board PCSS
 command
release circuit pack using the 
release board PCSS
 command
Super Frame Match Inquiry Test (#211)
The super frame is a means by which the SP synchronizes with the 140AY device 
on the Announcement circuit pack. If the super frame is not synchronized, the SP 
is not able to properly process record/playback requests. Both the SP and the 
hardware generate a super frame pulse. When these two pulses are out of synch, 
the SP sets a flag to indicate the mismatch. When this test is run, the state of this 
flag is returned.
Table 10-37.
TEST #211 Super Frame Match Inquiry 
Error 
Code
Test 
Result
Description/ Recommendation
2000
ABORT
Response to the test request was not received within the allowable time 
period. If Error Type 1538 is present in the Error Log, follow the 
maintenance strategy recommended for this Error Type.
2100
ABORT
Could not allocate the necessary system resources to run this test.
ABORT
Internal System Error.
1. Retry the command at one-minute intervals a maximum of five times.
Continued on next page