Page 10-590
DS1-BD (DS1 Interface Circuit Pack)
10
1005
ABORT
One-Way Span Test cannot be executed in the current configuration. To run
this, the TN767E or later suffix DS1 must be administered for 24-channel
operation. The "Bit Rate" field on the DS1 circuit pack administration form must
be set to "1.544" for 24-channel operation.
this, the TN767E or later suffix DS1 must be administered for 24-channel
operation. The "Bit Rate" field on the DS1 circuit pack administration form must
be set to "1.544" for 24-channel operation.
1015
ABORT
Ports on the DS1 Interface circuit pack have not been busied out to
out-of-service.
out-of-service.
1. Enter the
busyout board PCSS
command to put all trunks or ports of the
DS1 Interface circuit pack into the out-of-service state.
2. Retry the command.
1039
ABORT
The DS1 Interface circuit pack is providing timing for the system. Executing
this test could cause major system disruption.
this test could cause major system disruption.
If the DS1 Interface circuit pack needs to be tested, set the synchronization
reference to another DS1 Interface circuit pack or to the Tone-Clock circuit
pack via the following command sequence:
reference to another DS1 Interface circuit pack or to the Tone-Clock circuit
pack via the following command sequence:
1. Issue the
disable synchronization-switch
command.
2. Next, issue the
set synchronization PCSS
command.
3. Lastly, issue the
enable synchronization-switch
command.
1950
ABORT
Another loopback/span test is already executing on the DS1 board or the
board is in a network requested loopback mode (Line loopback or Payload
loopback). The hardware error log will indicate whether a Customer Loopback
Jack Test, Far CSU Loopback Test, or the One-Way Span Test is executing or
if the board is in line loopback or payload loopback mode. Only one
long-duration loopback/span test can be active at a given time. Thus, if a
loopback/span test is already active, that test must be terminated via the
board is in a network requested loopback mode (Line loopback or Payload
loopback). The hardware error log will indicate whether a Customer Loopback
Jack Test, Far CSU Loopback Test, or the One-Way Span Test is executing or
if the board is in line loopback or payload loopback mode. Only one
long-duration loopback/span test can be active at a given time. Thus, if a
loopback/span test is already active, that test must be terminated via the
test
ds1-loop PCSS end-loopback/span-test
command in order to execute this
test.
ABORT
Internal system error
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
Table 10-164.
TEST #1214 One-Way Span Test —
Continued
Error
Code
Code
Test
Result
Description/ Recommendation
Continued on next page