Lucent Technologies R5SI Manual Do Utilizador

Página de 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-748
HYB-LINE (Hybrid Line) 
10
Hybrid Circuit and Conference Circuit Test (#57)
This test checks the amount of reflection from the Hybrid loop around circuitry 
and a Conference Test. Please be aware that if no station is connected to the 
port being tested, the results of the test are not valid. The Tone-Clock circuit pack 
places a 1004-Hz tone on a time slot that the port circuit is listening on. A GPTD 
is connected to another time slot that the same port circuit is talking on. The 
on-board microprocessor places the port in the loop around mode and the GPTD 
measures the level of the reflected signal.
The Conference Test is performed after the Circuit Test. The Conference Circuit 
Test verifies that the NPE is able to listen to several test tones and correctly 
conference them together. The test is executed in two parts. The first half of the 
test checks the operation of the NPE’s first three conference channels. The NPE 
is put in the loop around mode and instructed to talk on a selected time slot and 
listen to the 1004-Hz tone using the first three Conference Channels. The signal 
level and noise level of the conferenced output are then measured using a GPTD 
and checked to verify that they are within an acceptable range.
The second half of the Conference Test checks the operation of the NPE’s 
remaining four Conference Channels and follows the same procedure as the 
preceding paragraph.
Table 10-209.
TEST #57 Hybrid Circuit and Conference 
Circuit Test 
Error 
Code
Test 
Result
Description/ Recommendation
ABORT
Could not allocate the necessary system resources to 
run this test.
1. Retry the command at one-minute intervals a 
maximum of five times.
2. If the test continues to abort, escalate the problem.
Continued on next page