Page 10-753
HYB-LINE (Hybrid Line) 
10
Hybrid Line Local Digital Loop Around Test (#58)
This test checks the control channel between the SPE and the port’s digital 
circuitry. The SPE sends transparent data to the on-board microprocessor and 
compares the data echoed back. This test is repeated three times.
PASS
Hybrid Circuit and Conference Circuit Test passed. The 
hybrid circuitry is transmitting properly.
1. If complaints still exist, investigate by using other 
port tests, and by examining the station, wiring, and 
connections.
0
NO 
BOARD
The test could not relate the internal ID to the port (no 
board). This could be due to incorrect translations, no 
board is inserted, an incorrect board is inserted, or an 
insane board is inserted.
1. Check to ensure that the board translations are 
correct. Use the 
list config
 command, and resolve 
any problems that are found.
2. If the board was found to be correctly inserted in 
step 1, issue the 
busyout board
 command.
3. Issue the 
reset board
 command.
4. Issue the 
release busy board
 command.
5. Issue the 
test board long
 command. This should 
re-establish the linkage between the internal ID and 
the port. If this is not the case, dispatch to check to 
ensure that there is a valid board inserted.
Table 10-209.
TEST #57 Hybrid Circuit and Conference 
Circuit Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page