Lucent Technologies R5SI Manual Do Utilizador

Página de 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-759
HYB-LINE (Hybrid Line) 
10
Hybrid Line Lamp Updates Test (#60)
For this test, the software lights the lamps on the terminal based on the status 
record contained in the processor. The lamp updates run only if the station is 
in-service.
0
NO 
BOARD
The test could not relate the internal ID to the port (no 
board). This could be due to incorrect translations, no 
board is inserted, an incorrect board is inserted, or an 
insane board is inserted.
1. Check to ensure that the board translations are 
correct. Use the 
list config
 command, and resolve 
any problems that are found.
2. If the board was found to be correctly inserted in 
step 1, issue the 
busyout board
 command.
3. Issue the 
reset board
 command.
4. Issue the 
release busy board
 command.
5. Issue the 
test board long
 command. This should 
re-establish the linkage between the internal ID and 
the port. If this is not the case, dispatch to check to 
ensure that there is a valid board inserted.
Table 10-211.
TEST #59 Hybrid Line Remote Digital 
Loop Around Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page