Maintenance Object Repair Procedures 
Page 10-865
MAINT (EPN Maintenance Circuit Pack) 
10
EPN Maintenance Circuit Pack Serial Link Test 
(#337)
This test is destructive.
This test checks the serial link from the Standby Expansion Interface circuit pack 
to the EPN Maintenance circuit pack. If there is no Standby link, or the Standby 
link is down at the time of the test, this test aborts.
2005
FAIL
EPN Maintenance Circuit Pack Reset passed, but the EPN Maintenance 
circuit pack did not respond to subsequent handshake message. Retry 
this command three more times. If it continues to fail, the EPN 
Maintenance circuit pack, the Active Expansion Interface circuit pack, or 
the serial link is defective. To determine which is defective, follow the 
appropriate procedures outlined below.
Duplicated Expansion Links:
1. Determine which serial link is the Standby by issuing the 
status system
 system technician command.
2. Switch Expansion Links by entering 
set expansion-link 
PCSS
 where PCSS is the 4-character Expansion Interface 
circuit pack location for the Standby link.
3. Run the Short Test Sequence against the EPN Maintenance 
circuit pack. If Test #306 still fails, replace the EPN 
Maintenance circuit pack and retest. Otherwise, follow the 
error routines for any errors that are logged by this Short Test 
Sequence.
Single Expansion Interface Link Switch:
1. Replace the EPN Maintenance circuit pack and invoke the 
Short Test Sequence.
2. If the error persists, replace the EI circuit pack, 
at a time 
when the EPN can go down with minimal inconvenience
.
3. If the error still persists, the problem is with the actual serial 
link in A carrier backplane and not with the EPN Maintenance 
circuit pack.
PASS
The Active Expansion Interface circuit pack can reset the EPN 
Maintenance circuit pack. This implies the EPN Maintenance circuit pack, 
the Active Expansion Interface circuit pack, and Active serial link are sane. 
There could still be a problem with the Standby Expansion Interface circuit 
pack and Standby serial link in a High or Critical Reliability system.
Table 10-245.
TEST #306 EPN Maintenance CP Reset Test  — 
Continued
Error 
Code
Test 
Result
Description/Recommendation 
Continued on next page