DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-985
OPS-LINE (DS1 OPS Line) 
10
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
NPE 
Crosstalk Test,
 for example, you may also clear errors generated from other tests 
in the testing sequence.
NPE Crosstalk Test (#6)
One or more NPEs reside on each circuit pack with a TDM Bus interface. The 
NPE controls port connectivity and gain, and provides conferencing functions on 
a per-port basis The NPE Crosstalk Test verifies that this port’s NPE channel talks 
on the selected time slot and never crosses over to time slots reserved for other 
connections. If the NPE is not working correctly, one-way and noisy connections 
may be observed. This test is usually only part of a port’s Long Test Sequence 
and takes about 20 to 30 seconds to complete.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
NPE Crosstalk Test (#6)
X
ND
Conference Circuit Test (#7)
X
ND
DS1OPS Switchhook Inquiry Test (#312)
X
X
ND
Audit and Update Test (#36)
X
X
ND
Table 10-285.
TEST #6 NPE Crosstalk Test 
Error 
Code
Test 
Result
Description/ Recommendation
ABORT
Could not allocate system resources to run this test or 
an internal system error (software) occurred.
1. Retry the command at 1-minute intervals a maximum 
of 5 times.
2. If the test continues to abort, escalate the problem.
Continued on next page