Lucent Technologies R5SI Manual Do Utilizador

Página de 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1113
PMS-LINK (Property Management System Link) 
10
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
Link 
Retry Test
, for example, you may also clear errors generated from other tests in 
the testing sequence.
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external PMS 
device. If the link has been disconnected already, then this test just returns 
"PASS." All resources allocated for a PMS Link are released after this test.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Link Tear Down Test (#213)
X
D
Link Retry Test (#215)
X
X
ND
Table 10-327.
TEST #213 Link Tear Down Test 
Error 
Code
Test 
Result
Description/ Recommendation
40
50
ABORT
Internal System Error.
1. Retry the command at one-minute intervals a 
maximum of five times.
2. If the test continues to abort, escalate the problem.
1010
ABORT
The PMS Link has been busied out and placed in the 
out-of-service state.
1. Enter 
release pms-link
 command to release the 
PMS Link from busyout state.
2. Retry 
test pms long
 command to execute the test.
Continued on next page