Lucent Technologies R5SI Manual Do Utilizador

Página de 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1616
UDS1-BD (UDS1 Interface Circuit Pack) 
10
Far CSU Loopback Test (#1213)
This test is destructive.
The Far CSU Loopback (R-LLB) Test causes a loopback at the far-end CSU and 
tests all circuitry and facilities from the local TN464F DS1 board to the far-end 
CSU.
The test is destructive and can only be initiated by a system technician 
demanded 
test ds1-loop PCSS far-csu-loopback-test-begin
 command.
All trunks or ports on the UDS1 Interface circuit pack must be busied out via the 
system technician 
busyout board
 command before running the Far CSU 
Loopback Test.
If the far-end CSU is not an AT&T 120A1 CSU Module, and the UDS1 is 
administered for ami-zcs line coding, one’s density protection must be disabled 
0
NO 
BOARD
The test could not relate the internal ID to the port (no 
board). This could be due to incorrect translations, no 
board is inserted, an incorrect board is inserted, or an 
insane board is inserted.
1. Ensure that the board translations are correct. 
Execute the 
add ds1 PCSS
 command to administer 
the UDS1 interface if it is not already administered.
2. If the board was already administered correctly, 
check the error log to determine whether the board 
is hyperactive. If this is the case, the board is shut 
down. Reseating the board will re-initialize the 
board.
3. If the board was found to be correctly inserted in 
step 1, then issue the 
busyout board
 command.
4. Issue the 
reset board
 command.
5. Issue the 
release busy board
 command.
6. Issue the 
test board long
 command.
This should re-establish the linkage between the internal 
ID and the port.
Table 10-472.
TEST #1212 CPE Loopback Jack Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page