Lucent Technologies R5SI Manual Do Utilizador

Página de 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1648
VC-DSPPT 
10
VC Port Reset DSP Test (#1106)
This test is destructive.
This test resets the VC-DSPPT and the DSP associated with it. As part of the reset 
procedure, the VC-DSPPT will execute a series of self- tests on the hardware. If 
these self- tests fail, the test will fail; otherwise the test will pass.
Before executing the test, the VC-DSPPT must be busied out by executing the 
busy port PCSSpp
 command. After the completion of the test, the VC-DSPPT 
must be released by executing the 
release port PCSSpp
 command.
Table 10-483.
TEST #1106 VC Port Reset DSP Test
Error 
Code
Test 
Result
Description/Recommendation
1000
ABORT
System resources required to run this test are not available, or the port may 
be busy with a call.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1015
ABORT
The VC-DSPPT is not busied out.
1. Busy out the VC-DSPPT by executing the 
busy port PCSSpp
 command 
and then retry the test. 
2000
ABORT
Response to the test was not received from the VC-DSPPT within the 
allowable time period.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2. If this result occurs again, replace the circuit pack.
2012
ABORT
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
2100
ABORT
Could not allocate the necessary resources for this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL
The reset of the VC-DSPPT was unsuccessful.
1. Replace circuit pack.
PASS
The VC-DSPPT was successfully reset.
1. Release the VC-DSPPT by executing the 
reset port PCSSpp
 
command.
Continued on next page