Lucent Technologies R5SI Manual Do Utilizador
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-631
test packet-control
8
Command resources busy;
Press CANCEL to clear, and then resubmit
If all of the available maintenance resources are currently in use, then the
following message will be displayed:
following message will be displayed:
All maintenance resources busy; try again later
Output
For the following output example, the command test packet-control 1B long was
entered. Note that carrier B is the active carrier in these example outputs.
entered. Note that carrier B is the active carrier in these example outputs.
Port
This field represents the Cabinet-Carrier in which the
Packet-Control resides.
Packet-Control resides.
Maintenance Name
The type of maintenance object that is being busied out.
Alt. Name
This field is not used in this output display.
Test No.
This field lists the test run on the packet-control.
Result
An indicator as to whether the object was successfully busied out
("PASS", "FAIL", "ABORT", "NO BOARD", "DISABLED", "EXTRA
BD").
("PASS", "FAIL", "ABORT", "NO BOARD", "DISABLED", "EXTRA
BD").
Error Code
A system-generated number that tells why the release failed or
aborted. A detailed list of the coeds according to "Test No." is
provided for each MO.
aborted. A detailed list of the coeds according to "Test No." is
provided for each MO.
test packet-control 1B l
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01B PKT-CTRL 583 PASS
01B PKT-CTRL 584 PASS
01B PKT-CTRL 585 PASS
Port Maintenance Name Alt. Name Test No. Result Error Code
01B PKT-CTRL 583 PASS
01B PKT-CTRL 584 PASS
01B PKT-CTRL 585 PASS
Command successfully completed