Fujitsu C122-E177-01EN Manual Do Utilizador

Página de 512
Dynamic Reconfiguration Operation 
 
--help 
Print the synopsis of report subcommand 
 
 
5.1.5.4  Example 
e.g. 
# /opt/FJSVdp-util/sbin/dp report 
Create report file at /tmp/dpreport-localhost-20130101-123456.tar.bz2 
 
 
5.2 
Hot plug collaboration function 
5.2.1  Description of collaboration function 
The resources (CPU and memory and IO resource) of SB or IOU increases or decreased by the DR 
operation. If external software depends on quantities or location of these resources, they are affected by DR 
operation. For this case, if the desired programs (called “collaboration program“) of external programs are 
registered in specific directories, the desired programs are automatically executed in hot plug collaboration 
function at SB/IOU hot plug. 
 
 
5.2.2  Collaboration program execution timing 
Hot plug collaboration function executes collaboration programs by the following hot plug events:  
• 
SB hot add 
o
 
Before enabling CPU and memory resources on a hot added SB (simply called “before addition of 
SB“) 
o
 
After enabling CPU and memory resources on a hot added SB (simply called “after addition of SB“) 
o
 
At the time that CPU and memory resources on a added SB fails to be enabled (simply called “at 
the addition  of SB failure time”) 
• 
SB hot remove 
o
 
Before disabling CPU and memory resources on a hot removed SB (simply called “before deletion 
of SB“) 
o
 
After deleting a SB from a partition (simply called “after deletion of SB“) 
o
 
At the time that a SB failed to be deleted from a partition (simply called “at the deletion of SB failure 
time) 
• 
IOU hot add 
o
 
Before enabling PCI devices on a hot added IOU (simply called “before addition of IOU“) 
o
 
After enabling PCI devices on a hot added IOU (simply called “after addition of IOU“)  
o
 
At the time that PCI devices on a hot added IOU fails to enable (simply called “at the addition  of 
IOU failure time”) 
• 
IOU hot remove 
o
 
Before disabling PCI devices on a hot removed IOU (simply called “before deletion of IOU“) 
o
 
After turning off an IOU (simply called “after deletion of IOU“) 
o
 
At the time that an IOU failed to be turned off (simply called “at the deletion of IOU failure time”) 
 
At each execution time, the hot plug collaboration function sequentially executes the collaboration program 
stored in the specified directory. 
The collaboration programs that are executed before addition of SB, after addition of SB, before deletion of 
SB, after deletion of SB, before addition of IOU, after addition of IOU, before deletion of IOU and after 
deletion of IOU  are executed in ascending order of program file names. 
The collaboration program that are executed at the SB addition failure time, at the SB deletion failure time, at 
the IOU addition  failure time and at the IOU deletion failure time are executed in descending order of 
program file names.