AMCC 9590SE-4ME Manual Do Utilizador

Página de 93
Controller Object Commands
www.3ware.com 
41
In order to redirect the output you must run the following command from a 
command line, not from within the tw_cli shell. 
tw_cli /c0 show diag > diag.txt
/c
x
 show rebuild
9000 series controllers support background tasks and allow you to schedule a 
regular time when they occur. 
Rebuild is one of the supported background tasks. Migrate and initialize are 
other background tasks that follow the same schedule as rebuild. Other 
background tasks for which there are separate schedules are verify and 
selftest. For each background task, up to 7 time periods can be registered, 
known as slots 1 through 7. Each task schedule can be managed by a set of 
commands including adddelshow and set a task. Background task 
schedules have a slot id, start-day-time, duration, and status attributes. 
For details about setting up a schedule for background rebuild tasks, see 
“Setting Up a Rebuild Schedule” on page 45. 
Rebuild activity attempts to (re)synchronize all members of redundant units 
such as RAID-1, RAID-10, RAID-5 and RAID-50. Rebuild can be started 
manually or automatically if a spare has been defined. Scheduled rebuilds will 
take place during the scheduled time slot, if enabled the schedules are 
enabled. For in depth information about rebuild and other background tasks, 
see “About Background Tasks” in the 3ware Serial ATA RAID Controller 
User Guide
The 
show rebuild
 command displays the current rebuild background task 
schedule as illustrated below. 
 //localhost> /c1 show rebuild
 Rebuild Schedule for Controller /c1
 ========================================================
 Slot    Day     Hour            Duration        Status
 --------------------------------------------------------
 1       Mon     2:00pm          10 hr(s)        disabled
 2       Thu     7:00pm          18 hr(s)        disabled
 3       -       -               -               disabled
 4       -       -               -               disabled
 5       -       -               -               disabled
 6       Mon     1:00am           4 hr(s)        disabled
 7       Sun     12:00am          1 hr(s)        disabled
A status of “disabled” indicates that the task schedule is disabled. In this case, 
the controller will not use the defined schedule timeslots. If the rebuild 
command is entered manually, rebuilding will start within 10 to 15 minutes. It 
will begin automatically if a rebuild is needed and a proper spare drive is set 
up.