Chief Manufacturing EVCM-100D Manual Do Utilizador

Página de 3
CHIEF MANUFACTURING INC.  1-800-582-6480, Fax: 1-877-894-6918, Email: chief@chiefmfg.com 
 
Page 1 of 3 
8808-000006 RevA 
INSTALLATION INSTRUCTIONS 
EVCM-100D 
Magna Lift™ Electric Ceiling Mount 
Prior to assembly, unpack carton completely and verify contents. 
If you are missing any of the following components, please contact Customer Service at 1-800/582-6480 
BEFORE PROCEEDING, READ INSTALLATION INSTRUCTIONS COMPLETELY 
WARNING!  IMPROPER INSATLLATION MAY RESULT IN SERIOUS 
PERSONAL INJURY! All components must be securely fastened to each other 
and to the ceiling. The overhead support must be capable of supporting five times 
the weight of the mount and equipment combined.  If it cannot is MUST be 
reinforced.
 
Unit Specifications 
 
Motor Operation Limits 
 
Run Time - 12 Minutes* 
 
Cool Time - 25 Minutes 
 
Run Time - 12 Minutes 
Do not exceed two cycles without an extended cooling period of 45 minutes.  To prevent 
damage to the Magna Lift, the unit will shut down for cooling if overheated. 
* It will take approximately 11 minutes to fully lower and raise 20 feet of cable under maximum load. 
Maximum Weight Capacity  .......................   250 lbs. (113.5) 
Maximum Travel  .......................................   20 feet (609.6 cm) 
Unit Weigh
t  ................................................   48 lbs. (21.6 kg) 
Electrical Requirements   ...........................   115 volts, 60 Hz, 1.6 amps continuous 
Read instructions completely before installing unit and connecting power. 
1.  Ensure 115-volt electrical power is readily available at the installation location. 
2.  Ensure support for the EVCM-100 ceiling mount is securely installed to the ceiling; if not 
the ceiling must be reinforced. Improper installation may result in serious personal 
injury. 
3.  Use the optional QD-1 for simplified installation or attach the EVCM-100 Magna-Lift 
directly to the NPT 1 1/2" column installed in your ceiling as follows: 
A  Thread the unit on the NPT 1 1/2" column and tighten securely using pipe 
wrench. 
B  After unit is tightened securely, install the thread locking set screw [Figure 1,  
Item (1) into the coupler, tightening it against threads on column.