Nortel Networks 703t Manual Do Utilizador

Página de 72
October 2006
Installing the server and connecting the peripheral devices
703t Server Hardware Installation
65
To connect the server to power
Plug the server’s AC power cord into the server’s rear panel.
Plug the other end into a wall receptacle or power bar.
To start the server
Press the server power switch to start the server.
Observe the Power-On Self Test (POST) and initialization messages on 
the monitor.
Let the mini-setup sequence run until you are prompted to log in to the 
operating system. 
Note: The system may perform multiple reboots. This is normal.
Ensure that the operating system logon window appears on the monitor.
Note: If the logon window does not appear, refer to the CallPilot 
Maintenance and Diagnostics guide for your server for troubleshooting 
instructions.
Proceed with the CallPilot server and switch configuration guide for your 
switch to connect and configure the server and switch.
WARNING
Risk of personal injury and risk of hardware failure
You must connect the power outlets that are used by the 
CallPilot server and its peripheral devices to the same 
single-point ground reference as the one used by the switching 
system connected to the CallPilot server. 
If this requirement is not met, power transients can cause 
personal injury, hardware failure, or both. For more information 
on single-point grounding requirements, refer to the Installation 
and Configuration Task List
 (555-7101-210).