Planning and Installation Guide
82
Chapter 4 — Creating an equipment
layout plan and a card slot assignment
plan
layout plan and a card slot assignment
plan
Take some time to plan the installation of the Option 11C Mini. This
preparation helps to make sure that the system performs correctly. Develop a
layout plan for the equipment to determine where you will position each
system component.
preparation helps to make sure that the system performs correctly. Develop a
layout plan for the equipment to determine where you will position each
system component.
Give consideration to the lengths of the different cables, so that you make the
best use of available space. Refer to Table 5 on page 37 of this guide for a
description of Option 11C Mini cable and wire specifications.
best use of available space. Refer to Table 5 on page 37 of this guide for a
description of Option 11C Mini cable and wire specifications.
Preparation of the site according to the plan is very important. Make sure that
the site is ready to accept the equipment. Make sure that items, such as power
outlets and backboards, are installed correctly.
the site is ready to accept the equipment. Make sure that items, such as power
outlets and backboards, are installed correctly.
Equipment layout plan
General layout guidelines
The following are the installation options for the Option 11C Mini chassis:
•
wall installation
CAUTION
Make sure that the mounting surface can support at least 100 lb
(45 kg).
(45 kg).