Nortel Networks Option 11C Mini Manual Do Utilizador
Page 91 of 332
Option 11C Mini
Planning and Installation Guide
100
Chapter 6 — Installing the Option 11C
Mini
Mini
This chapter contains tools and readiness checklists. Before beginning the
installation, make sure you have all the tools necessary to install the Option
11C Mini. Make sure you have checked all site requirements, received all
equipment, and have prepared an equipment layout plan and a card slot
assignment plan.
installation, make sure you have all the tools necessary to install the Option
11C Mini. Make sure you have checked all site requirements, received all
equipment, and have prepared an equipment layout plan and a card slot
assignment plan.
This chapter also provides a high-level summary of installation procedures
for the Option 11C Mini. Where applicable, the summary contains references
to chapters that describe the procedures in more detail.
for the Option 11C Mini. Where applicable, the summary contains references
to chapters that describe the procedures in more detail.
Tools checklist
To install the system correctly, make sure that the following tools are
available before you begin to assemble the components:
available before you begin to assemble the components:
different types of screwdrivers
a tape measure
a level
pliers such as side cutters and longnose pliers
an ECOS 1023 POW-R-MATE or similar type of test meter
appropriate cable terminating tools
a drill for making lead holes for screws