McDATA 3000 Manual Do Utilizador

Página de 428
5
5-20
McDATA UltraNet Edge 3000 User Guide
Configuring a 1x1 Ethernet Wide Area Network
Creating a Data 
Path
After configuring the IP circuit, you need to establish a connection 
between the FC/IP interfaces by creating a data path. This procedure 
will complete the configuration process.
Once you have configured the IP circuit, your screen should look like 
the following example:
1. In the main window of the UltraNet ConfigManager, right-click 
on the FC/IP interface (the cloud icon for Node10) in the network 
map.
The Create Data Path menu is displayed.
2. Click the Create Data Paths selection. You should see “marching 
ants” outlining the FC/IP interface.
3. Double-click on the destination FC/IP interface (the cloud icon 
for Node20) in the network map.
NOTE: 
For a 2x2 configuration, right-click the FC/IP interface (the cloud icon 
for Node 11), click Create Data Paths and then double-click on the 
destination FC/IP interface, (the cloud icon for Node 21) to map the second 
FC/IP interface.
Right-click on the cloud icon
Double-click on the 
cloud icon