Infocus LP750 Manual Do Utilizador
I n s t a l l t h e C e i l i n g M o u n t B a s e B o x o n t h e C e i l i n g
4
3
Place the ceiling plate or pipe extension in the
ceiling so that the base box hangs down into
the room.
ceiling so that the base box hangs down into
the room.
WARNING: If the
dropped ceiling is an air-
handling plenum, be sure
the cables are plenum-
rated, or install the cables
within conduit.
4
Route the projector’s cables through your
ceiling and out the hole in the ceiling.
ceiling and out the hole in the ceiling.
F
IGURE
1
Install the base box to the LiteMount False Ceiling Plate
make sure this
surface faces front