8. Preparations Before Operation 
 
Check the following items before starting operation:
 
 
  Visually inspect the UPS to verify that there is no visible damage. 
  Check that the UPS is connected to a utility power source that meets the input 
specifications.  
  Check that the input breaker    MAIN MCCB    is set to “OFF”. 
  Check that load devices are connected correctly.   
  Check that none of the cable connections is loose.
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
,  ⑤Check input   
power source
 
,  ⑤Check load 
connections. 
 
Breaker is “OFF”. 
※ 
This figure shows E11A202U001. 
As for E11A202U001J, shape and
the number of receptacles are
different.