APC SYCFXR9 Manual Do Utilizador

Página de 36
8
Symmetra PX 160 kW 400 V Operation 
990-3015-001
Operation Procedures
Note: If the system does not contain a PDU-XR, the Q1, Q2, Q3, and Q5 switches are located 
on an optional external maintenance bypass panel. Refer to the documentation included with the 
maintenance bypass panel for additional information.
Total Power Off procedure
Warning: Before electrical installation begins, verify that the UPS is in the Total Power Off 
mode by following this procedure.
Set the 
S
YSTEM
 E
NABLE
 switch to the the OFF
 
position.
Set the 
DC D
ISCONNECT
 switch on all XR Battery enclosures and on the back of the PDU-XR to the 
OFF position.
Disconnect all battery units by removing them or pulling them out to the red disconnect line. 
Caution: To ensure the enclosure does not tip, do not pull the battery units out beyond 
the red disconnect line unless you completely remove them from the enclosure.
ON
TRIP
OFF
UPS
XR Battery enclosures / PDU-XR