Hardwire Kit   SMT2200/3000 VA  100/120/230 VAC  Tower
2
Installation
Note:
 It is recommended that the input and output cables be connected to the terminal block prior to 
installing the terminal block in the UPS.
Remove the five screws that secure the factory 
installed PDU panels to the UPS.
Save the screws.
Disconnect the PDU input and output cables as 
shown in the diagram.
Secure the replacement input and output panels 
(supplied), to the UPS. Secure the panels with 
four of the screws removed from the factory 
installed PDU panel.
Install appropriate strain relief clamps (not 
supplied), to the input and output panels as 
shown in the diagram.