Cabletron Systems 1800 Manual Do Utilizador

Página de 232
Frame Relay Status and Configuration
5-12
Frame Relay Backup Groups
3.
Click on 
 to create a new entry, or on 
 to edit the entry 
currently selected in the list box.
Applying Port-level Changes
After you have made any port-level conÞguration changes, your changes will not 
take effect until you have done an on-line update. To do so:
1.
Click mouse button 3 on the port you have been configuring to display the Port 
Menu. 
2.
Drag down to On-line Update and release. 
Frame Relay Backup Groups
Frame Relay Backup Groups provide frame relay DLCIs with automatic backup 
protection should a DLCI fail. DLCIs are conÞgured as either ÒprimaryÓ DLCIs or 
ÒbackupÓ DLCIs. This is done either in console management (refer to your FRX or 
SmartSwitch 1800 hardware documentation) or in the Frame Relay DLCI Rate 
ConÞguration window (see 
). 
In a backup conÞguration, one end of the link is considered the ÒinitiatingÓ node 
and the other is the ÒremoteÓ, or non-initiating, node. The initiating end is the 
node that will establish the backup DLCI if it discovers that the primary DLCI is 
down. A node can be the initiating node for some backup conÞgurations, and the 
remote node for others.
On the initiating node, backup DLCIs are assigned to backup groups. Each group 
can contain up to ten backup DLCIs. A backup group is then assigned to one or 
more primary DLCI; each DLCI can have just one backup group.
If a node detects a failure in a primary DLCI connection, it will search the backup 
group assigned to that primary DLCI, and will select the Þrst available DLCI in 
that group as a backup. The backup will become operational and will remain in 
that state until the primary becomes active again. If the backup fails while in use, 
the node will check the status of the primary, then (if necessary) search the 
primaryÕs backup group for another backup.
Before conÞguring Frame Relay Backup Groups, you should Þrst conÞgure all the 
primary and backup DLCIs using either console management (refer to your FRX 
or SmartSwitch 1800 hardware documentation) or the Frame Relay DLCI Rate 
ConÞguration window (see 
). All DLCI 
NOTE
Any sessions in progress when a primary DLCI goes down will not be transferred directly 
to the backup DLCI, but will be reset, then established on the backup.