Verifying the Installation
When power is applied to the switch, power-on self-tests are run. You can verify 
proper operation of the BayStack 410-24T switch by observing the front-panel 
LEDs or by viewing the self-test results as displayed in the BayStack 410-24T 
switch Self-Test screen.
Verifying the Installation Using the LEDs
To verify the installation using the LEDs, check that the switch power-up 
sequence is as described in 
Figure 2-10.
Observing LEDs to Verify Proper Operation
Table 2-1.
Power-Up Sequence
Stage
Description
LED indication
1
Immediately after AC power is 
applied to the switch, DC power 
is available to the switch’s 
internal circuitry.
The Power LED turns on within 5 seconds (
). If the 
Power LED does not turn on, verify that power is available at the 
AC power outlet and that the power cable is fastened securely at 
both ends. If the Power LED remains off, contact the sales agent 
or the customer service representative from whom you 
purchased the switch.
2
The switch initiates a self-test.
As subroutines are initiated by the self-test, the port status LEDs 
flash various patterns. When the switch passes the self-test 
(within 10 seconds), the Status LED turns on (
If a nonfatal error occurs during self-test, the Status LED blinks.
If the switch fails the self-test, the Status LED remains off. 
Contact the sales agent or the customer service representative 
from whom you purchased the switch.
Power LED
Status LED
BS41044A
410-24T Switch
BayStack
Status Dwn
Pwr
Up
1
5
3
Cas
RPSU Base
Activity
Activity
21
19
23
Link
Link
17
13
15
11
7
9
2
6
4
22
20
24
18
14
16
12
8
10