Installation and Troubleshooting 2 - 21
Fan Operation Verification
To verify that the fan unit and the power supply fan are functioning 
correctly you need to visually inspect the fan unit(s) on the rear of the 
concentrator to make sure they are turning and that nothing is blocking 
their path.
Power Supply Operation Verification
Verify that the LEDs on the Controller Module appear as defined in 
Table 2-3 to check the operation of the power supply.
Table 2-3.  Controller Module LEDs After Proper Power-Up
LED
Proper State
Primary Power
On.
Backup Power
On.  A backup power supply is installed.
Off.  No backup power supply is installed.
Temperature (TEMP)
Off.