Sierra 215 Manual Do Utilizador

Página de 41
IM-215 Rev-A.1                                                    Series Innova-Switch™                                             Page 2 of 42 
                    
 
BEFORE STARTING 
 
SIERRA  INSTRUMENTS  appreciates  your  choosing  our  product  for  your  liquid  level  or  liquid/gas  flow 
switching application.  We are committed to providing reliable, quality instrumentation to our customers. 
 
To  ensure  the  maximum  and  intended  benefit  of  this  instrument,  we  encourage  you  to  read  this  brief 
operation and maintenance manual in its entirety prior to unpacking and installing the unit. 
 
The following precautions should be noted immediately: 
 
 
• 
WHEN INSTALLING YOUR INNOVA-SWITCH™ INTO A PIPE OR VESSEL USE A 1 1/8 INCH 
(28.575mm)  OPEN-END  WRENCH  TO  TIGHTEN  AT  THE  HEX  FLATS  OF  THE  MNPT  OF  A 
STANDARD  SWITCH.    (IF  YOU  HAVE  A  NON-STANDARD  SWITCH  AN  ALTERNATE  SIZE 
WRENCH MAY BE REQUIRED).  DO NOT USE THE INSTRUMENT HEAD TO TIGHTEN THE 
SWITCH  TO  THE  MOUNTING  PORT.    ROTATION  OF  THE  INSTRUMENT  HEAD  WITH 
RESPECT  TO  THE  SENSOR  BODY  CAN  CAUSE  INTERNAL  WIRING  DAMAGE  (SEE 
FIGURES 1). 
 
• 
THE  SWITCH  BODY  MUST  BE  ORIENTED  TO  HAVE  THE  TWIN  SENSORS  PARALLEL  TO 
THE LEVEL BEING DETECTED WHEN  THE SENSOR IS INSTALLED HORIZONTALLY  FOR 
POINT  LEVEL  APPLICATIONS.    LIKEWISE,  FOR  FLOW  APPLICATIONS,  THE  SWITCH 
BODY  MUST  BE  ORIENTED  TO  HAVE  THE  TWIN  SENSORS  PERPENDICULAR  TO  THE 
FLOW  BEING  DETECTED.    DUE  TO  THE  PIPE  THREAD  MOUNTING,  IT  MAY  BE 
NECESSARY  TO  MAKE  A  TRIAL  FIT,  ADD  OR  REMOVE  TEFLON  TAPE  OR  OTHER  PIPE 
THREAD  SEALANT,  AND  REINSTALL  TO  ACHIEVE  A  SATISFACTORY  SEAL  WITH  THE 
SENSORS  PROPERLY  ORIENTED.    FOR  VERTICAL  INSTALLATION  OF  SENSORS  FOR 
POINT  LEVEL  DETECTION  THE  ORIENTATION  MAKES  NO  DIFFERENCE.    PROPER 
ORIENTATION IS MARKED ON THE SWITCH BODY FOR REFERENCE (SEE FIGURE 5). 
 
• 
A GROUND WIRE MUST BE ATTACHED TO THE GROUND SCREW LOCATED INSIDE THE 
INSTRUMENT  ENCLOSURE  FOR  PROPER  OPERATION.    FOR  CENELEC/CE  OPTION  THE 
GROUND SCREW  IS LOCATED OUTSIDE  THE BODY  OF THE  INSTRUMENT  ENCLOSURE 
(SEE FIGURE 6). 
 
• 
BE  SURE  TO  APPLY  THE  PROPER  VOLTAGE  AS  CONFIGURED  AT  THE  FACTORY.    DO 
NOT  APPLY  115  VAC  TO  24  VDC  VERSIONS  OR  24  VDC  TO  115  VAC  VERSIONS.  
(LIKEWISE 230 VAC). 
 
• 
FOR  OPTIMUM  OPERATION,  CALIBRATION  MUST  BE  ACCOMPLISHED  AT  ACTUAL 
PROCESS  TEMPERATURE  AND  PRESSURE  CONDITIONS  IN  GASES  AND  AT  ACTUAL 
PROCESS TEMPERATURE CONDITIONS IN LIQUIDS.   
 
• 
DO  NOT  SANDBLAST  OR  ABRASIVE  CLEAN  THE  SENSING  PROBES.    THE  SENSING 
PROBES COULD BE DAMAGED BY ABRASIVES. 
 
• 
ALL DIMENSIONS GIVEN IN THIS MANUAL ARE IN INCHES (AND MILLIMETERS). 
 
 
If you have any questions prior to or during installation and calibration, please do not hesitate to call the 
factory  for assistance.  We  want to ensure  the very best possible installation and operational results for 
your benefit.