Lightwave Communications 8200 Manual Do Utilizador

Página de 33
 
10 
Attach two 13W3 video cables to the two user video ports on the back of the last 
auxiliary unit in the cascade, and secure them to the ports using the screws on the 
cable connector.  Attach the other ends of the cables to the CASCADE IN video ports 
on the next auxiliary unit closer to the master unit (the next unit upstream).  Be sure that 
the USER A port is attached to the CASCADE IN A port, and the USER B port is 
attached to the CASCADE IN B port.  Repeat this process, connecting the CASCADE 
IN ports of auxiliary units further away from the master (downstream units) to the USER 
video ports of those auxiliary units closer to the master (upstream units), until all units in 
the cascade are connected.  The master will have two video cables attached to its 
CASCADE IN ports, and the users' monitors connected to the USER video ports. 
 
 
 
Master unit with cables 
 
 
Auxiliary unit with cables