McDATA 3232 Manual Do Utilizador

Página de 612
2
Task 1: Verify Installation Requirements
2-7
Installation Tasks
Task 1: Verify Installation Requirements
Verify the following requirements are met prior to switch and 
management server installation. Ensure:
A site plan is prepared, configuration planning tasks are 
complete, planning considerations are evaluated, and related 
planning checklists are complete. Refer to the McDATA Products 
in a SAN Environment Planning Manual 
(620-000124) for 
information.
Fabric and device connectivity are evaluated, and the related 
planning worksheet is complete. Refer to the McDATA Products in 
a SAN Environment Planning Manual 
(620-000124) for information.
Support is available for one of the following switch management 
methods:
— A browser-capable PC and Internet connectivity to support 
switch management through the SANpilot interface, or
— A browser-capable PC and LAN segment connectivity to the 
rack-mount management server to support switch 
management through the SAN management application and 
element manager applications.
Support equipment and personnel are available for the 
installation.
The required number and type of fiber-optic jumper cables are 
delivered and available. Ensure the cables are the correct length 
with the required connectors.
A customer-supplied equipment rack and associated hardware 
are available (optional).
Remote workstations or simple network management protocol 
(SNMP) workstations are available (optional). Workstations are 
customer-supplied and connected through a corporate or 
dedicated LAN.