McDATA 3232 Manual Do Utilizador

Página de 612
2
2-10
Installation Tasks
Figure 2-2
Patch Cable and MDI Selector Configuration
5. Connect the U. S. power cord to the receptacle at the rear of each 
hub and to an AC power strip (a power strip is provided with the 
optional management server). Use an 18-inch electrical extension 
cord (provided) if required.
6. Connect the AC power strip to a facility power outlet. Power for 
each hub switches on when the strip is connected to facility AC 
power.
7. Inspect the front panel of each hub. Ensure each green Power 
light-emitting diode (LED) illuminates.
Rack-Mount 
Installation
Perform the following steps to install and configure up to three 
Ethernet hubs in a Fabricenter equipment cabinet or a customer- 
supplied 19-inch equipment rack. A pointed instrument (pencil tip or 
bent paper clip), #2 Phillips screwdriver, and 1/8-inch Allen wrench 
are required.
1. Secure one mounting bracket to each side of the first hub as 
shown in 
 on page 2-11. Use the two brackets and four 
pan-head Phillips screws (8/32 x 0.5-inch) provided.
1
MID
21
20
9
12
24
8
5
17
4
16
1
13
MDIX
1
MID
21
20
9
12
24
8
5
17
4
16
1
13
MDIX
1
1
MID
21
20
9
12
24
8
5
17
4
16
1
13
MDIX