IBM Type 8720 Manual Do Utilizador

Página de 180
Installing
 
a
 
management
 
module
 
Complete
 
the
 
following
 
steps
 
to
 
install
 
a
 
management
 
module
 
in
 
the
 
BladeCenter
 
T
 
unit:
 
 
1.
   
If
 
you
 
are
 
installing
 
a
 
second
 
management
 
module,
 
see
 
the
 
IBM
 
BladeCenter
 
T
 
Management
 
Module
 
User’s
 
Guide
 
for
 
information
 
about
 
management-module
 
redundancy.
 
 
2.
   
If
 
you
 
are
 
replacing
 
a
 
management
 
module,
 
remove
 
the
 
current
 
module
 
from
 
the
 
bay
 
(see
 
 
If
 
you
 
are
 
adding
 
a
 
management
 
module,
 
remove
 
the
 
filler
 
module
 
from
 
the
 
selected
 
management-module
 
bay
 
and
 
store
 
the
 
filler
 
module
 
for
 
future
 
use.
 
Note:
  
You
 
will
 
be
 
able
 
to
 
apply
 
a
 
saved
 
configuration
 
file
 
to
 
the
 
replacement
 
management
 
module.
 
For
 
more
 
information
 
about
 
applying
 
a
 
saved
 
configuration
 
file,
 
see
 
 
3.
   
If
 
you
 
have
 
not
 
already
 
done
 
so,
 
touch
 
the
 
static-protective
 
package
 
that
 
contains
 
the
 
new
 
management
 
module
 
to
 
an
 
unpainted
 
metal
 
part
 
of
 
the
 
BladeCenter
 
T
 
unit
 
or
 
any
 
unpainted
 
surface
 
on
 
any
 
other
 
grounded
 
rack
 
component
 
for
 
at
 
least
 
2
 
seconds.
 
 
4.
   
Remove
 
the
 
management
 
module
 
from
 
its
 
static-protective
 
package.
 
 
5.
   
Press
 
the
 
blue
 
release
 
button
 
on
 
the
 
management
 
module
 
to
 
open
 
the
 
release
 
latch.
 
Make
 
sure
 
that
 
the
 
release
 
latch
 
on
 
the
 
management
 
module
 
is
 
in
 
the
 
open
 
position
 
(90°
 
from
 
the
 
closed
 
position).
 
 
6.
   
Holding
 
the
 
management
 
module
 
at
 
the
 
front
 
with
 
one
 
hand,
 
and
 
in
 
the
 
middle
 
with
 
the
 
other
 
hand,
 
orient
 
the
 
management
 
module
 
to
 
the
 
bottom
 
of
 
the
 
selected
 
management-module
 
bay
 
and
 
gently
 
slide
 
the
 
management
 
module
 
into
 
the
 
bay
 
until
 
it
 
stops.
 
Push
 
the
 
management
 
module
 
in
 
until
 
the
 
release
 
latch
 
starts
 
to
 
close.
 
 
7.
   
Push
 
the
 
release
 
latch
 
on
 
the
 
front
 
of
 
the
 
management
 
module
 
to
 
the
 
closed
 
position.
 
 
8.
   
Make
 
sure
 
that
 
the
 
error
 
LED
 
on
 
the
 
management
 
module
 
is
 
not
 
lit,
 
indicating
 
that
 
the
 
management
 
module
 
is
 
operating
 
correctly.
 
 
9.
   
If
 
this
 
is
 
the
 
only
 
management
 
module
 
in
 
the
 
BladeCenter
 
T
 
unit,
 
configure
 
the
 
new
 
management
 
module.
 
See
 
the
 
IBM
 
BladeCenter
 
T
 
Management
 
Module
 
User’s
 
Guide
 
for
 
detailed
 
instructions.
 
If
 
this
 
is
 
the
 
secondary
 
management
 
module
 
and
 
you
 
followed
 
the
 
instructions
 
in
 
the
 
IBM
 
BladeCenter
 
T
 
Management
 
Module
 
User’s
 
Guide,
 
no
 
configuring
 
is
 
necessary.
 
The
 
secondary
 
management
 
module
 
receives
 
the
 
configuration
 
and
 
status
 
information
 
automatically
 
from
 
the
 
primary
 
management
 
module
 
when
 
necessary.
 
However,
 
you
 
must
 
apply
 
the
 
latest
 
level
 
of
 
firmware
 
from
 
the
 
IBM
 
Support
 
Web
 
site
 
at
 
to
 
ensure
 
smooth
 
changeovers
 
(see
 
the
 
IBM
 
BladeCenter
 
T
 
Management
 
Module
 
User’s
 
Guide
 
for
 
more
 
information).
 
Note:
  
Do
 
not
 
initiate
 
any
 
management
 
module
 
changeover
 
for
 
approximately
 
2
 
minutes
 
after
 
installing
 
the
 
secondary
 
management
 
module;
 
the
 
secondary
 
management
 
module
 
needs
 
the
 
time
 
to
 
receive
 
initial
 
configuration
 
and
 
status
 
information.
 
10.
   
If
 
you
 
have
 
other
 
modules
 
to
 
install
 
at
 
the
 
front
 
of
 
the
 
unit,
 
do
 
so
 
now.
 
Otherwise
 
reinstall
 
the
 
bezel
 
assembly
 
on
 
the
 
front
 
of
 
the
 
BladeCenter
 
T
 
unit.
 
 
Chapter
 
4.
 
Setting
 
up
 
the
 
BladeCenter
 
T
 
hardware
 
53