Fujitsu C122-E119EN Manual Do Utilizador
![Fujitsu](https://files.manualsbrain.com/attachments/6c4642b33d2edbd09f94719c20a133aa0e862902/common/fit/150/50/80a45702a21fefb1823bce6851e87db450dccf7792cb572ebc8a90330a68/brand_logo.png)
Signal name
Pin
Function
The length of the time from when the *ACOFF signal goes ON to when shutdown
processing actually starts can be specified from the MMB according to the operation. (*1)
The signal becomes valid when this line and GND (pin 5) are short-circuited.
GND
5
Common ground signal
*1: Shutdown Delay after UPS detected AC Failure: There is a possibility that the power failure detection signal
will be caused by a momentary power interruption. To be prepared for such cases, the maximum wait time until
shutdown can be specified (default value: 5 seconds).
PRIMEQUEST 1000 Series Hardware Installation Manual
APPENDIX B UPC Interface
APPENDIX B UPC Interface
85
C122-H004-07EN