Campbell Hausfeld IN728001AV Folheto

Página de 2
Press 
magazine latch button 
and pull magazine open.
Close 
magazine.
Load 
nails with points all the 
way into the groove.
2
Attach 
air 
hose to regulator 
outlet. 
Adjust 
regulator knob so 
outlet pressure is 
between 60 psi and 
100 psi.
1
Close 
pressure 
regulator, 
Turn 
ON
 compressor and 
Allow
 tank to reach 
maximum pressure.
NOTICE: To operate this tool you will need 
at least a 1 gallon compressor.
Setup
 
Like a Pro
   
CHN70200 — Air Powered Brad Nailer
Attach 
coupler on air 
hose to nailer inlet.
4
2 inch Brad Nailer 
CHN70200
IN728001AV  6/09
Setup
 Like a Pro
Easy Setup Guide
Projects are easier with 
Campbell Hausfeld products.
Thank you for deciding to purchase a 
Campbell Hausfeld product. We are dedicated 
to providing tools that help you to complete your 
projects Like a Pro
.
Load 
fasteners. See manual for further information regarding length and type 
of fasteners. 
3
 © 2009 Campbell Hausfeld/Scott Fetzer
 © 2009 Campbell Hausfeld/Scott Fetzer
 
Always disconnect the tool from  
  the power source when unattended, 
performing any maintenance or repair, clearing a jam, 
loading, unloading, or moving the tool to a new location.
Disconnect the tool from air source. Remove screw 
and battery compartment cover. Insert two (2) new 
batteries in the proper orientation. Do not mix old 
and new batteries. Close cover. Replace screw.
Battery Replacement
60
psi
100
psi
Screw
Visit us at
 
chpower.com