Cisco Systems RPS 675 Manual Do Utilizador

Página de 104
 
2-7
Cisco RPS 675 Redundant Power System Hardware Installation Guide
78-15201-04
Chapter 2      Installation
Preparing for Installation
Site Requirements 
Be sure to observe these requirements as you determine where to place the 
Cisco RPS:
Warning
This unit is intended for installation in restricted access areas. A restricted 
access area can be accessed only through the use of a special tool, lock and 
key, or other means of security. 
Statement 1017
For proper operation, where you locate the Cisco RPS is extremely important. 
If the equipment is placed too close together, the ventilation is inadequate, and 
panels are inaccessible, malfunctions and shutdowns might result, and 
maintenance will be difficult. 
Consider this information when you plan the location of the chassis:
  •
Provide for access to both the front and rear panels of the RPS 675. 
  •
Make sure that the room where the RPS 675 operates has adequate 
ventilation. Ambient air temperature might not cool equipment to acceptable 
operating temperatures without adequate ventilation. See 
 for temperature requirements.
Verifying the Package Contents
Note
Carefully remove the contents from the shipping container and check each item 
for damage. If any item is missing or damaged, contact your Cisco representative 
or reseller for support. Replace all packing material into the shipping container 
and save it.
These items are shipped:
  •
The RPS 675
  •
This Cisco RPS 675 Redundant Power System Hardware Installation Guide
  •
Where to Find the Catalyst Cisco RPS 675 Documentation flyer
  •
Product Registration Card
  •
AC power cord