Cecilware C-2003RG-IT Manual Do Utilizador

Página de 19
 
4
 
 
 
INSTALLATION AND OPERATING INSTRUCTIONS 
 
Warranty is void if the Brewer is connected to any Voltage other than the Voltage specified on the data 
label of the Brewer. 
 
UNPACKING AND INSPECTION 
Carefully unpack the Brewer by cutting the straps and lifting the carton off the Brewer. 
 
 
ASSEMBLY AND SET-UP 
The Brewer is shipped complete with: 
DESCRIPTION C-2003G-IT 
C-2003RG-IT 
C-2003LG-IT 
Decanters 3 
Funnels with sample Filter pack     
 
 
WATER HOOK UP 
The National Sanitation Foundation (NSF) requires the following for NSF approved installation: 
1.  A quick disconnect water connection or enough extra coiled tubing (at least 2x the depth of the unit) 
so that the Brewer can be moved for cleaning underneath. 
2.  An approved flow-back prevention device such as a double check valve to be installed between 
Brewer and water supply. 
 
WATER CONNECTION
 
The Brewer comes equipped with a ¼ inch flare water inlet fitting located in the back. Use a ¼ inch 
copper tubing to connect the Brewer to a cold water supply. Water pressure should be:  20 PSI min. to 
90 PSI max. An external shut-off valve and a water filtering system with a charcoal filter are highly 
recommended.   
 
Turn water supply on and check for leaks at the water inlet connections, tighten flare fitting if necessary. 
 
ELECTRICAL CONNECTIONS
 
For standard connections, Plug Power cord into a proper electrical outlet 15A.