Vulcan-Hart LG500 Manual Do Utilizador

Página de 18
LG SERIES GAS FRYERS 
VULCAN-HART                                                                                                                   F-32910 Rev. H (April 2008) 
-3-
 
 
 
TABLE OF CONTENTS 
 
IMPORTANT FOR YOUR SAFETY……………………………………….  
 2 
INTRODUCTION……………………………………………………………  
 GENERAL…………………………………………………………… 
 
 
ORDERING PARTS………………………………………………… 
 4 
 
FRYER CAPACITIES………………………………………………. 
 4 
 UNPACKING………………………………………………………… 
 
INSTALLATION…………………………………………………………….  
  Clearances………………………………………………….... 
 
  Location 
………………..……………………………….….  
CODES AND STANDARDS……………………………………….. 
 6 
ASSEMBLY …………..…………………………………………… 
 6 
FLUE CONNECTION………………………………………………. 
 6 
GAS CONNECTION…………………………………………………. 
 7 
 
Quick-Disconnect for Units on Casters………………………..   7 
GAS PRESSURE............................................................................     7 
TEST GAS SUPPLY……………………………………………………    7 
FRYERS WITH CASTERS…………………………………………….    8 
LEVELING THE FRYER…………………………………………… 
 9 
OPERATION………………………………………………………………… 10 
 OVER-TEMPERATURE 
SHUTDOWN……………………………. 
10 
 
BEFORE FIRST USE………………………………………………... 
10 
  Cleaning…………………………………………………….... 
10 
FILLING TANK WITH SHORTENING…………………………… 
11 
LIGHTING 
THE 
PILOT 
      12 
TURNING 
ON 
THE 
FRYER 
……. 
     13 
TURNING 
OFF 
THE 
FRYER 
     13 
EXTENDED SHUTDOWN………………………………………….. 
13 
BASIC FRYING INSTRUCTIONS………………………………….. 
13 
 Fry 
Basket 
Guidelines……………………………………….. 
14 
EXTENDED SHORTENING LIFE………………………………… 
14 
DRAINING THE TANK……………………………………………. 
15 
DAILY FILTERING-ALL MODELS………………………………. 
15 
CLEANING…………………………………………………………. 16 
 Daily…………………………………………………………. 16 
BOIL OUT PROCEDURE……………………………………………….... 
17 
MAINTENANCE…………………………………………………………..  
18 
FLUE VENT INSPECTION……………………………………….. 
18 
Service in the US and Canada…………………………………... 
18 
In Australia…………………………………………………………. 
18 
TROUBLESHOOTING…………………………………………………….. 18 
 Troubleshooting 
Chart………………………………………………. 
18