Kobe Range Hoods IN2730SF Manual Do Utilizador

Página de 23
 
Wiring to Power Supply 
SAFETY WARNING 
RISK OF ELECTRICAL SHOCK.  THIS RANGE HOOD MUST 
BE  PROPERLY  GROUNDED.    MAKE  SURE  THIS  IS  DONE 
BY QUALIFIED ELECTRICIAN  IN  ACCORDANCE WITH  ALL 
APPLICABLE 
NATIONAL 
AND 
LOCAL 
ELECTRICAL 
CODES.    BEFORE  CONNECTING  WIRES,  SWITCH  POWER 
OFF  AT  SERVICE  PANEL  AND  LOCK  SERVICE  PANEL  TO 
PREVENT
 
POWER 
FROM 
BEING 
SWITCHED 
ON 
ACCIDENTALLY. 
9.  Temporarily  wire  the  hood  to  test  for  proper  operation 
before  installing.    If  the  insert  does  not  operate,  check 
the circuit breaker or house fuse.  If the insert is still not 
working,  disconnect  the  power  supply  and  check  the 
continuity of all wiring connections.  
10. Connect electrical wires. 
11. Connect  three  wires  (black,  white  and  green)  to house 
wires  and  cap  with  wire  connectors.    Connect  wires 
according  to  their  colors  (i.e.  black  to  black,  white  to 
white, and green to green).  See Figure 3. 
12. Store wires in the wiring box. 
13. Determine  the  proper  location  for  the  Power  Supply 
Cable.    Make  a  wiring  access  hole  using  a  drill  bit.   
Install  the  wire  cable  and  seal  the  gap  around  hole.  
Note: Connect all electrical wires before installing insert.  
DO NOT turn on the power until installation is complete.   
 
Duct Work Installation 
14. Use 6” steel pipe (follow building codes in your area) to 
connect the ducting on the hood to the ductwork above.  
Use  duct  tape  to  seal  and  secure  joints  as  shown  in 
Figure 4.   
15. Please refer to local codes for the usage of the damper 
(included).    If  necessary,  remove  the  damper 
mechanism and install as exhaust connector. 
Hood Preparation Before Installation 
 
CAUTION
:    If  moving  the  cooking  range  is 
necessary  to  install  the  hood,  turn  off  the  power  in 
an  electric  range  at  the  main  electrical  box.    SHUT 
OFF THE GAS BEFORE MOVING A GAS RANGE. 
 
16. Determine and mark the centerlines on the base of the 
wood frame where the insert will be installed.  
17. Determine  and  make  all  necessary  cuts  in  the  wall  or 
ceiling  for  the  ductwork.    Note:  Install  the  duct  work 
before installing the insert.  
18. Cut  out  the  opening  where  the  insert  will  be  installed. 
(Figure 5) 
 
 
 
Figure 4 
 
 
                             
 
 
 
 
 
 
 
 
 
 
Figure 5