Bunn 38791.0000K Manual Do Utilizador

Página de 26
19
REPLACING THE PUMP TUBING
The pumps and tubing used in the dispenser are designed to give maximum performance and long life. However, the 
tubes are a wear item and must be replaced periodically. How long the tubes last is dependent on usage and properties of 
the concentrate. Excessive wear will reduce the output of the pumps resulting in a weak mixed beverage. Bunn-O-Matic 
recommends replacing the Pump Tubing a minimum of once every 6 months or sooner if warranted.
Refer to the Tube Replacement Instruction inside the Cabinet door.
Note: To avoid concentrate spills, rinse the pump tubing with warm tap water prior to removing the tubes, (Refer to steps 
1 - 4 of the Weekly Sanitizing instructions).
1.  Loosen the thumbscrew (Fig 1) securing the tubing retainer plate to the pump body and set the retainer plate aside.
2.  Depress the tension screw and remove it from the notch in the pump body, releasing the spring tension on the pump 
band (Fig 2).
3.  Gently pull the pump tube from around the pump rotor (Fig 3).
4.  Inspect the pump bands, rollers and housing for contamination or signs of wear. Clean or replace worn parts if neces-
sary.
5.  Apply lubricant (BUNN-O-MATIC part no. M2531.0001) to the middle section of the new pump tubing (Fig 4).
6.  Carefully wrap the new tubing around the rotor, making sure that the elbow and clamps end up on the front side of the 
pump body (Fig 5).
7.  Depress the tension screw and insert it in the notch in the pump body, reapplying spring tension on the pump band.
8.  Install the free end of the tube over the inlet port of the mix chamber on that side of the cabinet (Fig. 5).
9.  Replace the tubing retainer plate and tighten the thumbscrew.
9.  Open the product container and insert the stainless steel drawtube into the container (Fig 6).
10.  Repeat steps 1 through 9 for the other pump.
Note: Replacement Tube Kits can be purchased from BUNN-O-MATIC. Order part no. 37942.1000 
Fig 1
Fig 2
Fig 3
Fig 4
Fig 5
Fig 6
Remove Retaining Plate
Release Spring Tension
Remove Tubing
Lubricate New Tube
Install New Tubing
Completed Installation
Lubricate between arrows
2.0”
2.0”
Thumbscrew
Tension
Screw
Elbow & 
Clamps
Inlet Port
Retaining 
Plate
38791 031010
PREVENTIVE MAINTENANCE
Bunn-O-Matic
®
 Corporation recommends that preventive maintenance be performed at regular intervals. Maintenance 
should be performed by a qualified service technician. For Technical Service, contact Bunn-O-Matic
®
 Corporation at 
1-800-286-6070.
NOTE: Replacement parts or service caused by failure to perform required maintenance is not covered by warranty.
 
Replace pump hoses every 6-Months or as needed.