Enviro 1200 Fireplace Freestanding Manual Do Utilizador

Página de 50
Installation
M
ODEL
 1700 B
RICK
 P
LACEMENT
 & T
UBE
 L
OCATIONS
:
COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS.
When replacing bricks, use only pumas type fire bricks.
TOTAL BRICKS:
15 - Full size bricks  9” long x 4.5” wide x 1.25” thick
 
 
 
(22.9 cm long x 11.4 cm wide x 3.2 cm thick)
2 - Partial bricks       9” long x 3” wide x 1.25” thick
 
 
 
(22.9 cm long x 7.6 cm wide 3.2 cm thick)
1 - Half brick   
4.5 “ long x 4.5” wide x 1.25” thick
 
 
 
(11.43 cm long x 11.43 cm wide x 3.175 cm thick)
Removing Air Tube: If a secondary air tube needs to be removed, place a screwdriver (any style except 
flat head) into one of the air holes and tap it with a hammer/mallet to the left until the right end of the 
tube is freed.  To installation a secondary air tube reverse the above instructions.
IMPORTANT: All secondary air tubes must be in place for proper operation.
Brick
Full S
ize Br
ick
Half
Partia
l Brick
Tube A
Tube C
Tube B
Figure 43: Brick Placement for 1700 shown with Secondary Air Channel 
and Tubes.
36
1. Place  the  four  (4)  full  size 
bricks  along  each  side  of 
the firebox and one (1) full 
size  brick  on either  side  of 
the back of the firebox.
2. To place the floor bricks, lay 
the  two  (2)  partial  bricks 
along the back of the floor. 
Then on the left, lay three 
(3)  full  size  bricks  and  on 
the  right,  lay  two  (2)    full 
size bricks in the center and 
the  half  brick  in  the  front 
(for  the  ash  dump).  The 
spaces  between  the  bricks 
will soon fill with ashes.