Paradyne CSU Manual Do Utilizador

Página de 470
4. Configuration Options
9128-A2-GB20-80
September 2002
4-19
PVC Backup Over the Network Interface
Generally, backup can be performed on the network interface’s frame relay link 
using a backup PVC, as well on an ISDN link; the unit does not have to have the 
ISDN DBM feature.
In this case, create a DLCI Record on the network interface that will be used for 
backup, then modify the PVC Connections or Management PVCs to add the 
alternate destination.
Setting Up Back-to-Back Operation
Using this special feature, you can set up two FrameSaver units that are 
connected back-to-back without frame relay switches between them, as in a test 
bench setup using a crossover cable.
Changing Operating Mode
When setting up back-to-back operation:
„
One unit must be configured for Standard operation, which is the setting for 
normal operation.
„
The other unit must be configured for Back-to-Back operation so it presents 
the network side of the UNI (user-network interface).
Only one of the units will have its operating mode changed.
Procedure
 
To set up back-to-back operation:
1. On the unit to be configured for Back-to-Back operation, manually configure 
DLCIs; DLCIs should be configured before connecting the two units.
2. Access the Change Operating Mode screen.
Main Menu
Control
Change Operating Mode
3. Select Back-to-Back Operation, and respond Yes to the 
Are you sure? 
prompt.
4. Save the change.
Procedure
 
To return the unit to normal operation:
1. Return to the Change Operating Mode screen and switch back to Standard 
Operation.
2. Respond Yes to the prompt and save the change. The units can be 
reconnected to a standard frame relay network.