II. General Information
A. Sequence of Operation and Timing Charts
1. Refrigerator 
a) Sequence of Operation
Note: The start circuit of the compressor is timed such that at power-up and during any 
compressor off time, there will be at least a  minute delay before the compressor 
will start. The compressor has a  minute minimum run time during every run 
cycle. The only exception is when the overload activates and deactivates. 
Cycle On (Cut-on 
temperature reached) 
[Minimum .0 minutes]
1. Compressor on
. Condenser fan on
POWER ON
1. Frame heaters on
. Evaporator fan on
2.0 minute delay
1. Compressor start-up
. Condenser fan start-up
Cycle Off (Cut-out 
temperature reached) 
[Minimum .0 minutes]
1. Compressor off
. Condenser fan off
If evaporator temperature 
reaches 13°F, unit initiates 
defrost. Defrost initiation for
RH1-AAC-W is 7°F. 
1. Compressor off
. Condenser fan off
(Note: Evaporator fan is on.)
Evaporator temperature 
reaches 40°F, defrost 
terminated
1. Compressor on
. Condenser fan on
Normal cycling continues