Jet 131000 1ss-3c-10 - 1-ton capacity 10-ft 3-phase electric chain hoist Guia Do Utilizador

Página de 28
 
8
Unpacking 
Open carton and check for shipping damage. 
Report any damage immediately to your 
distributor and shipping agent. Do not discard 
any shipping material until the Lever Hoist is 
assembled and running properly. Read this 
entire instruction manual thoroughly for set-up, 
maintenance and safety instructions. 
Contents of the Carton 
1 Lever 
Hoist 
1 Owner's 
Manual 
1 Warranty 
Card 
Installation 
Support for the hoist may be hook, clevis pin, 
trolley, or beam clamp. Whatever method of 
suspension is chosen, the support components 
must
 be rated equal to, or greater than the 
capacity of the lever hoist. Supporting structures 
(such as I-Beams, etc.) should be installed by 
properly licensed professional installers. 
Pre-Operation Inspection 
Inspecting the Load Chain 
1.  A chain stop must be attached to the 
second-to-last link on the slack end of the 
chain. See Figure 2. 
 Do not operate the hoist with 
a twisted, kinked or damaged chain. Do not 
splice the chain.
 
2.  Check that the chain does not twist along its 
length from hoist to hook. If twist is present 
on units with multiple falls, the hook must be 
passed back through the chain loop to 
remove all twist in the chain. 
3.  Replace the chain if links are stretched too 
long or seriously worn on the surface, 
especially at the points where links contact 
each other. See “Allowable Limits” on page 
12 for measuring chain elongation.  
4.  Do not use a chain that is seriously rusted 
or cracked. 
5.  Periodically apply a light coat of 30-weight 
oil to the chain. This will create easier 
operation and prolong the chain’s life. For 
optimum results, clean the chain with an 
acid-free solution before oiling. 
 
 
 
Figure 1 
Features and terminology 
 
Figure 2