Viking Range dmoc205ss Instrução De Instalação

Página de 4
EXHAUST DUCT ASSEMBLY CONT.
Illustration 4
Illustration 3
SCREW A
DUCT A-1
DUCT BC
SCREW A
SCREW A
SCREW A
DUCT A-2
DUCT A-1
SCREW A
SCREW A
SCREW A
DUCT A-3
DUCT A-2
SCREW
BOTTOM DUCT 
ASSEMBLY
FLANGES
DETAIL A
SCREW C
Illustration 5
Illustration 6
3
. Position DUCT (A)-1 on the top of the oven inserting edge of DUCT (BC) assembly into hole lip of DUCT (A)-1.
Tighten two SCREWS (A), securing DUCT (A)-1 to DUCT (BC) assembly. See illustration 3.
3. Position DUCT (A)- on the top of the oven and insert it into the hold lip of DUCT (A)-1. Secure DUCT (A)- to DUCT
(A)-1 using two SCREWS (A) provided. See illustration 4.
4. Position DUCT (A)-3 on top of the oven and insert it into DUCT (A)-. Secure DUCT (A)-3 using three screws (A)
provided. See illustration 5.
5. Place the Bottom Duct in the opening. When the Bottom Duct Assembly is in the opening correctly, the flanges
will be tightly against the lower edge of the opening. See Illustration 6.
6. Secure the Bottom Duct Assembly with the two (1-3/16”) screws C. IMPORTANT: Secure screws in outer hole.