Hisense kf-2302gwe Guia Do Utilizador

Página de 43
Min. 8mm
Thickness 
of 8mm
Heat insulation materials
Tapered nuts
Copper tube
Flarer
   
5.REFRIGERANT TUBE
5.1 Flaring the tube
(1) Cut the tube with a tube cutter to the desired length 
(30.50cm is recommended)
(2) Smooth the edge of the copper tube with a reamer or a 
file. Hold the pipe vertically with one end downward 
to  make  sure  that  no  copper  scraps  fall  into  the 
copper tube.
           Figure 17a                        Figure 
17b
(3) Put the tube flarer on the copper tube.
(4) Flare the copper tube ( Figure 18)
                                            Figure 18
Note: The flared tube should have:
    Smooth internal surface
    Smooth edges
    Consistent length of the tapered surface
5.2 Connection of the tubes 
(1) The sealing tube must be used to prevent dust or 
water from getting into the tube.
(2) Before connecting the tube, apply some refrigerant 
oil on the surface of the flared tube and connections 
to prevent air leakage.( Figure 19)
(3) Align the connecting tube and the flared tube, and 
then  turn  the  tapered  nut  to  connect  tightly. 
(Figure 20)
(4) Fasten the nuts with a spanner.
Copper
tube
Before
After
Reamer
Application
of refrigerant oil
Flared tube
Connecting
tube
5.3 Heat insulation of the refrigerant tube
All refrigerant tubes must be insulated heat with at 
least 8mm thick insulation materials. (Figure 21)
5.4 Wrapping the tubes
(1)  Tie  the  two  refrigeration  tubes  (including 
electrical wire if permitted as regulated), water 
drainage hose with white tape.
(2) Wrap half of the tubes outside the room starting 
from the end. (Figure 22)
(3) Fix the wrapped tubes on the wall in clips with a 
space of 120cm.
Note: Do not tie the tubes too tight as this may reduce 
heat  insulation.  Separate  water  drainage  hose  and 
refrigeration  tubes  to  prevent  formation  of  water 
droplets.
5.5 Ending of installation
After completion of wrapping and insulation, seal the 
hole on the wall with a suitable sealant.
5.6 Discharge gas
Place appliance A and then B. Air purging method is as 
follows:
(1) Turn down the nuts on the wide and narrow tubes.
(2) Loose the nut of the flared wide tube one complete 
turn with a spanner.
(3) Turn counterclockwise to open the core of the valve 
with a socket screw wrench. Some gas will come out 
from under the nut of the flared end of the wide tube. 
Tighten the nut 10 to 15 seconds later.
(4) Test for leakage at the tube connector with soapy 
water  or  a  meter.  If  there  is  no  leakage,  turn 
counterclockwise to open the tube core of the valve 
on the wide tube with a socket screw wrench.
(5) Tighten the nuts on the wide , narrow tube valves and 
the valve cover.
Please  contact  the  technical  service  for  further 
information.
   
Appendix: Installation
25
Figure 20
Figure 21
Clip
Covering tubes with
heat insulation materials
Figure 22
Figure 19