3com 5500-ei pwr Guia De Configuração Rápida

Página de 118
30
C
HAPTER
 2: I
NSTALLING
 
THE
 S
WITCH
Placing Units On 
Top of Each Other
If the Switch units are free-standing, up to eight units can be placed one 
on top of the other. If you are mixing a variety of SuperStack
®
 units, the 
smaller units must be positioned at the top.
If you are placing Switch units one on top of the other, you must use the 
self-adhesive rubber feet supplied. Apply the feet to the underside of 
each Switch, sticking one in the marked area at each corner. Place the 
Switch units on top of each other, ensuring that the feet of the upper unit 
sit fully on the lower unit.
The Power-up 
Sequence
The following sections describe how to get your Switch 5500 
powered-up and ready for operation.
Powering-up the
Switch 5500
Use the following sequence of steps to power-up the Switch.
Plug the power cord into the power socket at the rear of the Switch.
Plug the other end of the power cord into your power outlet.
The Switch powers-up and runs through its Power On Self Test (POST), 
which takes approximately one minute.
Checking for Correct
Operation of LEDs
During the Power On Self Test, all ports on the Switch are disabled and 
the LEDs light. The PWR LED will flash green during the POST.
When the POST has completed, check the PWR LED to make sure that 
your Switch is operating correctly. 
 shows possible colors for the 
LED. 
Table 10   PWR LED Colors
Color
State
Green
The Switch is powered-up and operating normally.
Red
The Switch has failed its Power On Self Test (POST).
Yellow flashing
Some ports have failed POST
*
* In this event you can still use the Switch via the remaining ports that have passed the 
POST.
Off
The Switch is not receiving power. 
DUA1715-0AAA02.book  Page 30  Wednesday, March 23, 2005  11:17 AM