3com 5500-ei pwr Instrução De Instalação

Página de 1072
 
1-23 
Network diagram 
Figure 1-5 Network diagram for network management interface configuration 
 
 
Configuration procedure 
# Enter system view and configure VLAN 3 as the management VLAN.  
<Sysname> system-view 
[Sysname] management-vlan 3 
# Add Ethernet 1/0/1 to VLAN 3. 
[Sysname] vlan 3 
[Sysname-vlan3] port Ethernet 1/0/1 
[Sysname-vlan3] quit 
# Set the IP address of VLAN-interface 3 to 192.168.5.30.  
[Sysname] interface Vlan-interface 3 
[Sysname-Vlan-interface3] ip address 192.168.5.30 255.255.255.0 
[Sysname-Vlan-interface3] quit 
# Add Ethernet 1/0/2 to VLAN 2. 
[Sysname] vlan 2 
[Sysname-vlan2] port Ethernet 1/0/2 
[Sysname-vlan2] quit 
# Set the IP address of VLAN-interface 2 to 192.168.4.22.  
[Sysname] interface Vlan-interface 2 
[Sysname-Vlan-interface2] ip address 192.168.4.22 255.255.255.0 
[Sysname-Vlan-interface2] quit 
# Enable the cluster function. 
[Sysname] cluster enable 
# Enter cluster view. 
[Sysname] cluster 
[Sysname-cluster] 
# Configure a private IP address pool for the cluster. The IP address pool contains 30 IP addresses, 
starting from 192.168.5.1. 
[Sysname-cluster] ip-pool 192.168.5.1 255.255.255.224 
# Name and build the cluster. 
[Sysname-cluster] build aaa