Belkin f1dc108c Manual Do Utilizador
![Belkin](https://files.manualsbrain.com/attachments/1896736472dd3b3d9f3ce1bc8b2daebdaedb5f6f/common/fit/150/50/63aa490975d7edb72437d8c6e4cb1ac02e8635927b0fd894254ad45ed0a0/brand_logo.jpeg)
1
2
3
4
5
6
7
8
section
17
Installation
Connecting the Primary and Secondary KVM Switches:
Step 1
Step 1
Using the Daisy-Chain Cable (F1D108-CBL), connect one end to the
“Daisy-Chain” port on the LCD Rack Console (BANK 00).
“Daisy-Chain” port on the LCD Rack Console (BANK 00).
Step 2
Connect the other end of the Daisy-Chain Cable (F1D108-CBL) to the
“Daisy-Chain Out” port of the first secondary KVM switch (BANK 01).
“Daisy-Chain Out” port of the first secondary KVM switch (BANK 01).
Step 3
To add secondary units, connect one end of the Daisy-Chain Cable
(F1D108-CBL) to the “Daisy-Chain In” port on the first secondary KVM
switch and the other end to the “Daisy-Chain Out” port of the next
secondary KVM switch (for example, BANK 01).
(F1D108-CBL) to the “Daisy-Chain In” port on the first secondary KVM
switch and the other end to the “Daisy-Chain Out” port of the next
secondary KVM switch (for example, BANK 01).
Step 4
Repeat Step 3 for additional PRO3 KVM Switches you wish to
daisy-chain together.
daisy-chain together.