PowerDsine 6548 Manual Do Utilizador

Página de 28
 
PD-6548
 
 
Power over Ethernet Solutions 
22 
Cat. No.: 06-6860-056 
3.5 
Connecting Data Cables 
1.  Connect the previously routed cables to the switch’s output ports. 
2.  Connect the cables from the IEEE 802.3af ready terminals (PDs) 
to the corresponding Data & Power ports on the Midspan’s front 
panel. 
3.6 
Connecting Power Cables 
When using AC source to power the Midspan, plug in the provided power 
cord at the rear AC connector. 
 
 
Notes:  
♦  A readily accessible disconnect device shall be incorporated in the 
building installation wiring. 
♦  The PD-6548 Midspan should be installed at Restricted Access Location 
 
3.7 Powering 
up 
The Power over Ethernet Midspan has no on/off switch. To apply or 
remove power to the Midspan, insert or remove the power cable from the 
AC receptacle on the rear panel of the unit. 
With power applied, the Midspan powers-up and the internal fan 
operates; then, the device runs through its power-on self-test (POST), 
which takes less than 10 seconds. During the POST, all ports are 
disabled and the indicators illuminate in the following sequence: 
1.  AC indicator illuminates orange 
2.  Port indicators and AC power indicator illuminate green.  
3.  Main AC indicator remains lit green; port indicators are off. 
Ports are now enabled for normal operation.