Netgear GS716Tv3 – ProSAFE 16-Port Gigabit Managed Switch Manual Do Equipamento

Página de 42
20
 GS716T, GS724T and GS748T Gigabit Smart Switch
Step 3: Check the Installation
Before applying power perform the following:
Inspect the equipment thoroughly.
Verify that all cables are installed correctly.
Check cable routing to make sure cables are not damaged or creating a safety hazard.
Ensure all equipment is mounted properly and securely.