Netgear GS716Tv3 – ProSAFE 16-Port Gigabit Managed Switch Guia Do Administrador
Monitoring the System
238
GS716Tv3, GS724Tv4, and GS748Tv5 Smart Switches
•
To clear the counters for a specific port, select the check box associated with the port
and click the Clear button.
and click the Clear button.
•
Click the Refresh button to refresh the data on the screen and display the most
current statistics.
current statistics.
Cable Test
Use the Cable Test screen to display information about the cables connected to switch ports.
To perform the cable test:
1.
Select Monitoring
>
Ports > Cable Test.
2.
Select the check box next to each port on which to run the cable test.
3.
Click the Apply button.
The cable test is run on all selected ports.
The cable test can take up to 2 seconds to complete. If the port has an active link then the
link is not taken down and the cable status is always Normal. The command returns a
cable length estimate if this feature is supported by the PHY for the current link speed.
Note that if the link is down and a cable is attached to a 10/100 Ethernet adapter then the
cable status can be Open or Short because some Ethernet adapters leave unused wire
pairs unterminated or grounded.
link is not taken down and the cable status is always Normal. The command returns a
cable length estimate if this feature is supported by the PHY for the current link speed.
Note that if the link is down and a cable is attached to a 10/100 Ethernet adapter then the
cable status can be Open or Short because some Ethernet adapters leave unused wire
pairs unterminated or grounded.